- Structural engineering and building services and equipment studies for 2 tower blocks with a total floor area of 15,000m², “Forrest Towers” in Kinshasa. These tower blocks are due to be used for accommodation and offices.
- Studies for the construction of the taxiway at Lubumbashi airport for Korongo (EGMF and SN Brussel).
- Civil engineering studies for the drinking water plant for the south of Kinshasa/ Lukaya for the company China New Era International.
- Comprehensive studies (architecture, civil engineering, structural engineering and building services) for 3 cotton ginning plants in Burkina Faso: Léo, Ouaga and Bobo Dioulasso. Budget: 10 million Euros per plant.
- Studies for the construction of the STL copper and cobalt treatment plant in Katanga. Budget: 115 million dollars.
- Studies for the construction of an apartment block with a floor area of 8,000m² on Avenue Lukasa in Gombe (Kinshasa).
- Studies for the construction of a housing estate, “Champs de coton” in Kinshasa, for Utex Africa; as well as another housing estate of around 10,000m².
- Studies for the extension of Kindu Hospital.
- Structural engineering and building services and equipment studies for the extension to N'Galiéma Hospital in Kinshasa. Creation of a children’s heart surgery unit with a floor area of around 1,300m².
- Studies looking at the stability of erosion in Kinshasa (DRC) at sites in Mataba and Selembao.
- Civil engineering studies for the construction of a cemetery in Senegal.